Detailed Birds-eye Overview of the Layout and Controller | Wonky Peaks Railway

In the final installment for today, John gives us a much more detailed look at the Wonky Peaks layout – as well as some of the stock that is currently running on it. John also gives some important tips about how to design a model railroad layout, if you are thinking about doing one yourself. The Wonky Peaks Railway is being controlled by a ‘DigiTrax’ system.

Trains in this video include:

The MP15DC is a versatile locomotive that is employed by both large and small railroads across North America in road freight and yard switching duties.

Issues with Derailments | Wonky Peaks Railway

John gives us another tour of the Wonky Peaks Railway layout, with the focus on the derailments issue of the model railway layout. As discussed previously, the main issue is the steepness of the hill going in to the first tunnel. Another issue seems to be with the switches, that sometimes uncouples the trains.

Early December 2013 Overview | Wonky Peaks Railway

John shows us the progress (or lack of it) on the official Dirty Boxers model railway: ‘Wonky Peaks Railway’. The tanker train is having issues with the gradient up to the first tunnel.

We have four trains currently on the model railway, with lots of stock too, however the controller can only see two trains at one time.

DB650 – Is Mrs Splinter actually Konnie Huq?

It be Wednesday…

We have many people on todays show. Ben and Mrs Splinter call in, with Dan in studio and Callum as well. We discuss the similarity of one Konnie Huq and Mrs Splinter in appearence.

Wonky Peaks, jm1117’s model train creation is the subject of much discussion and compliments. We then reenact a double date.