Early December 2013 Overview | Wonky Peaks Railway

John shows us the progress (or lack of it) on the official Dirty Boxers model railway: ‘Wonky Peaks Railway’. The tanker train is having issues with the gradient up to the first tunnel.

We have four trains currently on the model railway, with lots of stock too, however the controller can only see two trains at one time.

Leave a Reply

Your email address will not be published. Required fields are marked *